Page 21

ENsep17-eMag

700 650 600 550 500 450 400 350 300 250 200 150 100 50 23 tanks in Welded $658,168 competenz.org.nz Grow your people Food and Beverage Processing qualifications ensure your people work productively and safely. For entry-level and experienced workers. Talk to us about training your people on-the-job. www.engineeringnews.co.nz 21 Every day a plant isn’t operating is a significant cost in lost production – often tens of thousands. So, while the installation of Europress saved Pernod Ricard 37% over against welding the pipework, the biggest saving was due to the fact 0800 526 1800 EN236 M A M J J A S 37% additional installation cost over Europress 58% additional installation time over Europress TIME (months) MONEY ($000) Welded $28,616 per tank 23 tanks in Europress $413,316 Europress $17,970 per tank Every day a plant isn’t operating is a significant cost in lost production it was 58% faster to install. Europress allowed Pernod Ricard to commence with production at full capacity over two months earlier than if they had welded the pipework. “We had a very tight deadline to reinstate tanks following the 2016 Kaikoura earthquake in time for vintage and needed a rapid install of services piping for new tanks being installed at the Tamaki site. A fully welded option wasn’t going to be acceptable due to the long install time. So, we trialed Europress piping on four tanks, which was completed simultaneously with five tanks that were welded. The result showed that the Europress option was the way to go going forward, and so the remainder of the tank farm was completed using that. The installation time proved to be less than half that which was quoted for welded pipe install, and installed costs have come in at two-thirds that of welded piping,” says Mr Waller. Figure 1. PRODUCTION COMPARISON


ENsep17-eMag
To see the actual publication please follow the link above